local_shipping easyclearance.pl
GVMS / ro-ro / urgent

GMR number before the crossing, not after the problem.

We check whether the movement data, references and vehicle are ready to be linked in GVMS. This page is for movements where a correct GMR before the ferry or tunnel is what counts.

Crossing

Ferry or tunnel affects the required data set.

References

We verify that the clearance and references actually link to the crossing.

Driver en route

In urgent cases we immediately identify what is blocking GMR generation.

What we check

Clearance references

Whether the documents and identifiers needed for the crossing are ready and correct.

Vehicle and carrier data

Whether the data can be safely linked to the specific crossing.

GVMS scenario

Whether the crossing actually requires GMR and which dependencies must be resolved before movement.

Ferry and tunnel change the data requirements
We check GMR before the terminal
Fast status for driver and operations

01

We receive route and crossing

Without movement information it is impossible to properly assess the GMR path.

02

We verify references

We check whether the clearances and movement data actually fit the GVMS scenario.

03

We send status to the driver

The client receives a clear update on what is ready and whether anything still blocks the crossing.

Lead form

Send data for GMR verification.

Most common blockers

  • priority_highIncomplete clearance references or a single missing piece of information needed for the crossing.
  • priority_highInconsistency between crossing, vehicle and the references being linked in GVMS.
  • priority_highNeed for a fast status update for the driver as the transport approaches the terminal.
Call WhatsApp